Create

Design Project Gallery

Project Search
Search projects by keyword, program, course, or submission year.

CaSE Cornerstone Design Project: Gwynns Falls / Leakin Park Bridge (Stream Steppers)

Project Description:

The guiding principle behind our team was to create a solution to the stream that integrates seamlessly with the existing trail environment and infrastructure without drawing any excess attention. Based on the vision of the Friends of Gwynns Falls, our goal was for the trail to be functional without compromising the character of the park.

To achieve this, our design incorporates minimal materials: wood and screws. Also, the design only consists of two types of wood members, 2×6 and 6×6, approaching the design in a simplistic, low-profile way, which maintains a clean, consistent look without any extra clutter.

For each side of our walkway, there are gentle ramps at either end to ensure a seamless passage for hikers and cyclists. A slight grade allows water flow for the stream under the walkway. As a whole, our proposal provides a complete solution to the current issue.

Project Photo:

Five team members standing side by side

Stream Steppers Team Photo

Student Team Members

  • Jack Bolon
  • Sarah Fleming
  • JunYup Kim
  • Diego McHenry
  • Brooke Ojeda

Course Faculty